Auto Parts Direct Fit three way catalyst converter For Lifan 320

High combustion efficiency: The three-way catalytic converter can increase the combustion efficiency of fuel and improve the power output of the engine.


Product Detail

Product Tags

About Catalytic Converter

The main component of ceramic carrier is cordierite, which is usually extruded, dried and sintered at high temperature using ceramic materials. The ceramic carrier is a honeycomb-like entity when viewed from the cross-section, and the wall thickness is very thin. The purpose is to make full use of the existing volume to increase the chemical reaction area of the catalyst reaction bed, and also to prevent thermal degradation of the catalyst. In order to allow the catalytic converter gas flow to have a larger surface circulation area, the carrier is usually made into a honeycomb shape with very thin wall thickness to make full use of the limited space. At present, the main product specifications mostly use 400 mesh (400 holes/square inch) or 600 mesh (600 holes/square inch) ceramic honeycomb carrier. During the extrusion process, a large number of thin-walled, parallel, usually square channels are generated.

Parameters

Carfitment
OE NO. Car Fitment: Mold Year:
- Lifan 320 - -
         
Product name Lifan 320
Model Number DJN859
Brand Name DJN
Emission Standard: EURO 2/3/4/5
Material Inside : ceramic(honeycomb) substrate 400cpsi with mat
  Shell :304 or 409 # stainless steel shell,stainless steel pipe
Oxygen sensor ports Yes
cpsi 400 /600/800
Wall thickness 0.09±0.025
Warranty 30000 miles performance/2 years
Packaging: Air bubble film and Carton Packing
MOQ: 50 pcs
Supply Ability 1000 Piece/Pieces per Week
Place of Origin: Jiangsu
SAMPLE ORDER: Accept
Condition new
Function reduce harmful emission (CO,HC,NO) from motor vehicle Over 95% conversion efficiency;
Service Customers' specific demands available, design drawings are welcomed. OEM service is accepted
Supply Ability 1000 Piece/Pieces per Month
Packaging & delivery Air bubble film and Carton Packing, inside fix the product decently with expanded material
Port Shanghai/Ningbo
Lead time: 10-30 days .
Active catalyst ingredients Pt, Pd, Rh, and rare earth elements
Shape round, oval, race track

 

H09beeecc963947c5897c92c04d77a5740.jpg_720x720q50(
H09beeecc963947c5897c92c04d77a5740.jpg_720x720q50(1)(1)(1)(1)
H09beeecc963947c5897c92c04d77a5740.jpg_720x720q50(1)(1)(1)
H09beeecc963947c5897c92c04d77a5740.jpg_720x720q50(1)(1)
H09beeecc963947c5897c92c04d77a5740.jpg_720x720q50(1)(1
Haf283ad2c2ad4133b3784c1d7d1418ebC
A8b2ac3c406904a56b063551a32e859f8V.jpg_720x720q50(1)(1)
H18748d413dc547d792762e7ba187a081I
Hd26b2fce0f9c45a6b38f9644e23d2cbcA
H5e79e9d20e8b441fa7f63ab1dcc29838g
A7116de2fa493428b8ec65889d4a201cfv
7c29e7b2b3164fe8303172a89b36099
He128c582c2f249278d3bf25c951f0b19t

  • Previous:
  • Next:

  • Write your message here and send it to us